Monday 30 January 2012

A Framework for Utilising Residents’ Skills in the Kouga Region


I (Trevor Watkins) developed this proposal in October 2011, after discussions with Glen Buchner and Dries van Heerden, on a way to assist the KM without costing a huge amount. The proposal was presented to the Acting Municipal Manager and the Mayor, on several occasions. No response was ever received.

Introduction


The Kouga Municipality (KM) is faced with formidable challenges – a fact that has been honestly acknowledged by the mayor and municipal manager. The KM is not alone in facing these challenges. Virtually every municipality in the country is compromised. Towns, cities and states all around the world are having to deal with reduced incomes, spiralling costs and rampant corruption.

This document contains a proposal to address these challenges using the existing skills and knowledge that already exist within our local population, without compromising the integrity of the democratic structures currently in place. These proposals will require sympathetic consideration, compromise and cooperation from all sides of the great South African divide. But South Africans have shown themselves capable of this cooperation in the past, given the right leadership.

Perhaps we can begin another phase of our journey on the great South African project right here in Kouga – perhaps we can bring about a municipal Codesa of our own.

The Reality

  • The responsibility for the governance of Kouga rests with 29 elected councillors. The ANC has 15 councillors and the DA has 14. Consequently, the ANC councillors are the governing party, and appoint the Mayor, mayoral committee and senior members of the municipality.
  • Councillors are elected because the voters believe they will best represent their interests. Councillors do not necessarily have the specific management and technical skills required to run a municipality.
  • The KM finances are in a bad way, with expenditure exceeding income, and many creditors not being paid.
  • The KM is overstaffed, with staff expenditures well above the national norm.
  • The Kouga infrastructure is weak or failing in many areas, and requires urgent attention.
  • There are numerous cases of corruption pending within the KM. Oversight processes are weak.
  • There is a large reservoir of management, engineering, and legal skills within the KM area, due to the large number of retirees living in the area. These skills have not been effectively utilised in the past.
  • The KM area has distinct first world and third world components, whose interests are often at odds with each other. The KM council must look after the interests of ALL its residents.
  • The KM cannot currently afford to hire expensive management consultants to address the many issues highlighted above.

The Challenge


The challenge, which this document attempts to address, is how to effectively and cheaply deploy the existing skills in the area in order to improve municipal services, without compromising the authority and responsibility of the elected representatives.

Any proposed solution which appears as a takeover of KM responsibilities, which disrespects the current officials, which is perceived as political or racist in any way, will predictably be rejected.  Any proposal which sidelines the roles and responsibilities of the councillors will never be accepted by the councillors.

Conversely, the KM must commit to cooperate fully with residents offering to share their time and skills, and must commit to seriously consider any recommendations which may arise. If carefully considered ideas and plans are simply dismissed or ignored, then this process will quickly fail.

The Proposal


In cooperation with the KM and Kouga businesses, a new not-for-profit entity is established to provide consulting services to the KM. For the sake of convenience let this entity be known as the KM Consulting Group (KMCG) within this document (Any other name can be chosen at a later date).

  • The KMCG will be registered as a legal entity, such as a CC or company or NPO, a board of directors will be appointed, and a voluntary staff recruited from local businessmen and residents.
  • The objective of KMCG is to provide consulting services to the KM at little or no cost, utilising the voluntary services of skilled retirees.
  • The KMCG will maintain a database of skills in the local population which may be called upon.
  • The KMCG will require some startup funding and support from the local community. Facilities such as meeting rooms, photocopy facilities, printing and stationery will be sourced from local businesses.
  • The KM will present specific issues, questions or problems to the board of KMCG, who will then setup project teams to investigate these issues and propose a solution in the form of a written report.
  • The KM will ensure that all the information and access to staff required by the project team is provided in good time. Where this access is not forthcoming, the project will be suspended.
  • The KM will consider these reports, request modifications or explanations, then present the finalised reports to the KM management or the council for action.
  • The KMCG project team will remain available to advise the KM on implementation of any accepted project.
  • Each project team will prepare a detailed plan and budget for the consulting exercise, costing all work at market-related rates. Each project will require approval from the KMCG board before commencing. The Rand value of each consulting project will be carefully calculated and recorded.
  • The KM will not be charged for a consulting project. Thus no tender or purchase procedures will be required before commencing the project. However, the KM must show the cost of each consulting project as an asset in its financial reports.
  • The KMCG board and staff and consultants will receive no remuneration for their services, which are entirely voluntary. Out of pocket expenses will be reimbursed on presentation of documentation, where possible. Nevertheless, strict hourly recordkeeping will be maintained in order to correctly evaluate the cost of the project and its performance against budget.
  • The objective of each consulting project is to offer specific practical advice on specific problems identified by the KM. The advice must avoid generalisation, politics, personal references, and ambiguity. The project report will contain a detailed breakdown of costs, staffing, materials, etc required for successful execution of the recommendations.

Project Examples


An illustrative list of possible projects is given below:
  1. 2012 Budget development
  2. Sewage plant engineering options
  3. Revenue boosting alternatives
  4. Potential cost savings in KM
  5. Staffing reduction processes
  6. Improved tender controls
  7. Financial monitoring proposal
  8. Low cost housing planning
  9. Employment strategies for Kouga
  10. Alternative health strategies for Kouga
  11. Infrastructure maintenance strategies on a low budget
  12. Paradise Beach Swamp drainage strategies

Conclusion

The purpose of this proposal is to suggest a strategy whereby the many unused skills available in the Kouga region can be usefully deployed to the benefit of the Kouga Municipality and the inhabitants of the area.  The proposal does not infringe on the autonomy of the KM or the council, will not add any financial burden to the already hard-pressed KM finances, but will provide them with a source of expert advice on the many difficult problems they face. It will require a major contribution of time and effort from some sectors of the population, who are already quite heavily taxed.  It will require mutual respect and cooperation from all parties.

However, if it leads to an improvement in the conditions in our small corner of paradise, it will be worth it.


Trevor Watkins
Sunday, 16 October 2011

No comments:

Post a Comment

Please enter your comments here.